Monday, January 9, 2023

 CEM1 is OPC ( 95% Clinker and 5% Gypsum )

CEM2 and Others are PCC  ( 65% Clinker )

Note: At OPC Clinker Amount Is Higher Than PCC.So OPC Cost is Higher Than PCC.

No comments:

Post a Comment

How Much Slump Should Be?

 Slump Should Be Minimum 13mm and Maximum 230mm